In the steaming line in the oil unit, there is a leakage on the pipe (3 inches)
at condition 100֯ C and 10 bar pressure.
1- we took the size of the pipe to manufacture the clamp.
2- the clamp was manufactured in the workshop.
3- the clamp was installed and sealant was injected by EGYSCHEMA engineers.
The leakage has been stopped successfully.
Yorumlar